Metal Works Classics

Projects

69 Camaro

 Project Image 
 Project Image 
 Project Image 

The Camaro is undergoing a conversion from Prostreet to Protouring. We will be retaining the Shaffiroff 540/695hp big block chevy and swapping the turbo 400 for a TCI 6x six speed automatic transmission with a billet 3400 rpm stahl convertor. The shifting will be done with a 2011 Camaro shifter that has been converted with a new Hurst Shifter dress up kit. Optional paddle shifters will be added to the Ididit tilt steering column. The entire Camaro dashboard is being removed and a custom Marquez designs unit to be installed. More information to come. Very nice project to watch!

Final Completion
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Interior
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
New smoked glass
New smoked glass installed and ready for interior.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
New valve covers
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Assembly
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Engine, wheels, tires
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Gauges
Checkout the gauges, vents, and steering wheel
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Installing new leather dash
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Color sanding
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Painted
They guys just painted the car. These shots are of it still in the paint booth first thing the next morning before they unmask it.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Assembly
Assembly prior to paint.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Primer coating
Tim spraying primer on the car. The pics are a little blurred because they have to be shot through the paint booth windows.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Slicksand over repair areas
Putting slicksand on the repair areas so they can be block sanded.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
New windshield wiper system
Raingear windshield wiper system. This is an upgraded system that mounts in the cowl area.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Fabrication work on firewall
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Firewall modification
Here you can see all the point that have been marked for work on the firewall. Couple shots of the interior door panels done, stereo mods, and the new 2010 or newer Camaro shifter.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Swapping transmissons
Tony pulling the Turbo 400 and replacing with the TCI 6X six speed automatic transmission.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Seats and shifter mockup
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Fabricating new seat mounts
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Ridetech air suspension
Installing the Ridetech air suspension system.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Interior mock up
Mocking up the new fiberglass dash and door panels
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Accuair control system mock up
Adapting air tanks, compressors and control system for air ride. Also anticipating space for battery and stereo components.
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Disassembly
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Mocking up wheels
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
Before
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 
 Project Image 

HomeAbout UsFacilityProjectsGalleryStoreContact
Street RodsMuscle Cars
©2014 MetalWorksClassics.com. MetalWorks Eugene, Oregon